UPDATE
Click here to see the completed room with all the details and sources!
It’s week 4 of the One Room Challenge and I am feeling the pressure now! Only two weeks left to get everything finished and now it’s all the small details that seem to take the longest and are most tedious. I wasn’t able to get as much done this week as I would have liked because of my crazy work schedule, but I did finally finish one big thing! (post contains affiliate links, see disclosure)
Read all about the One Room Challenge here!
The biggest change this week was I finally got the large mirror installed. I mentioned last week I had to order special hardware from Amazon and they arrived. I ended up hanging the mirror by myself and it was super easy with these heavy-duty picture hooks. The large mirror makes such a difference in this small room and makes it feel much larger. In week one, I mentioned that part of my design was using the room heights to my advantage. And it worked! Without revealing too much – here is a sneak peek –
PROGRESS
BEFORE
It’s fun to look back at the before from just a few weeks ago. It’s such a big difference! I still need to install trim on the vanity cabinet, paint the vanity and update the hardware. I finished all the cuts and install for the tile, now I just need a couple of days to grout it and let it dry. Then, it’s baseboards, door trim and I’m done!
TO DO LIST
- install tile floor
- update baseboards
- update door trim
paint wallspaint ceiling- update and paint vanity
- change vanity hardware
new vanity top & sinkinstall new sink faucetremove old vanity lightinstall new vanity light in a new locationnew mirror- new shower curtain & rod
install new window shade
Be sure to check out what the other One Room Challengers are doing to their spaces!

