UPDATE

Click here to see the completed room with all the details and sources!


It’s week 4 of the One Room Challenge and I am feeling the pressure now! Only two weeks left to get everything finished and now it’s all the small details that seem to take the longest and are most tedious. I wasn’t able to get as much done this week as I would have liked because of my crazy work schedule, but I did finally finish one big thing! (post contains affiliate links, see disclosure)

Read all about the One Room Challenge here!

Click here to see the before photos and my design plans!

The biggest change this week was I finally got the large mirror installed. I mentioned last week I had to order special hardware from Amazon and they arrived. I ended up hanging the mirror by myself and it was super easy with these heavy-duty picture hooks. The large mirror makes such a difference in this small room and makes it feel much larger. In week one, I mentioned that part of my design was using the room heights to my advantage. And it worked! Without revealing too much – here is a sneak peek –

PROGRESS

BEFORE

It’s fun to look back at the before from just a few weeks ago. It’s such a big difference! I still need to install trim on the vanity cabinet, paint the vanity and update the hardware. I finished all the cuts and install for the tile, now I just need a couple of days to grout it and let it dry. Then, it’s baseboards, door trim and I’m done!

TO DO LIST
  • install tile floor
  • update baseboards
  • update door trim
  • paint walls
  • paint ceiling
  • update and paint vanity
  • change vanity hardware
  • new vanity top & sink
  • install new sink faucet
  • remove old vanity light
  • install new vanity light in a new location
  • new mirror
  • new shower curtain & rod
  • install new window shade

Be sure to check out what the other One Room Challengers are doing to their spaces! 